Recent Projects! — HDB

HDB Reinstatement Project @ Kim Tian Place

Demolition & Hacking HDB Painting Refurbishing Reinstatement Work Retrofit

HDB Reinstatement Project @ Kim Tian Place

Last March 2022, we were engaged to do reinstatement works to several HDB units that were being returned back to HDB.  What this means is that we have to strip down all the previous renovation works done by the previous owner(s), and return them back to its original state before HDB puts these units back on the marketplace for sale.  Some of the works done for this particular flat @ Kim Tian Place:  - Dismantling and disposal of leftover furniture and fittings- Hacking of floor/ wall tiles to entire unit. - Laying of floor/ wall tiles only at Kitchen and Bathrooms- Electrical...

Read more →


Painting Works for a HDB 4 Room Flat

HDB Painting

Painting Works for a HDB 4 Room Flat

Last November 2019, Jeremy Renovation was engaged to re-paint the four walls of a matured HDB unit.  First, we had to move away all existing furniture in the way of these walls, followed by securing layers of plastic wrap on all the furniture and floors to protect, catch and prevent any drippings from staining your possessions.  Check out our painting packages available today!  Here are images of the paint job done: 

Read more →