HDB Reinstatement @ Yung Ho Road

Jeremy Renovation was engaged to do reinstatement works to a HDB bombshelter unit. 

What this means is that we have to strip down all the previous renovation works done by the previous Tenant/ Client, and return them back to its original state at the end of the tenancy period. 

Some of the works done:

- Dismantling and disposal of leftover furniture and fittings.
- Patch-up & repairs of any uneven/ damaged walls and floorings. 
- Reinstate all electrical & air-conditioning works back to original layout. 
- Reinstate back all plumbing and sanitary.
- Painting of whole unit.

Here are the images of the afters: 

 

Back