This 4-leveled commercial property originally used as a warehouse/ storage space, now transformed into a childcare center equipped with its own kitchen, open-concept gym, outdoor playground, classrooms and office space.
All of the works done have been approved by the relevant authorities with the relevant permits.
Here are a brief rundown of all the works done:
- Space planning, concept and design.
- Erection of gypsum partition walls.
- Re-painting whole unit.
- Specialized children toilet & shower installation on every level.
- Waterproofing and tiling of new wet areas.
- Floor installation to non-wet areas.
- Relocation of M&E to suit new layout, including electrical re-wiring and air-con works.
Here are the before/ after/ during images of the unit: